Details
|
:
|
TO (I) DESIGN AND BUILD SEWAGE TREATMENT PLANTOF INSTALLED CAPACITY 7 MLD INCLUDING MPS AND ALL APPURTENANT STRUCTURES AND ALLIED WORKS INCLUDING UV DISINFECTION AND DISPOSAL & REUSE FACILITY ,ONLINE WASTE WATER QUALITY ANALYZER TO MEASURE, ANALYSE AND CONTROL PH, TSS, BOD, COD TOC ETC, FLOOD PROTECTION WORKS, DISPOSAL OF TREATED EFFLUENT AND EFFLUENT CHANNEL;(II) SURVEY, REVIEW THE DESIGNS, REDESIGN WHERE NECESSARY, AND BUILD NEW CONSTRUCTION OF PUMPING STATION AT NODES AT 3,6 10 & 15, CONSTRUCTION OF 2.2 KM OPEN DRAINS, 19NOS. INTERCEPTION & DIVERSION WORKS FOR THE DRAIN , 5.7 KM OF UNDERGROUND DRAINAGE NETWORK, PUMPING MAIN, CONSTRUCTION OF COLLECTIONS SUMP AT 19 NODE, PIPING WORS AT LIFT STATIONS, PUNPUN RIVER CROSSING WITH RISING MAIN;(III) SCADA AND ONLINE MONITORING SYSTEM, (IV) PROVISION FOR DEDICATED FEEDER MAIN FOR UNINTERRUPTED POWER SUPPLY TO STP/PUMPING STATIONS & DG SETS FOR POWER BACKUP (V)OPERATION & MAINTENANCE OF THE COMPLETE WORKS OF SEWAGE TREATMENT PLANT INCLUDING MPS AND INTERCEPTION & DIVERSION WORKS FOR A PERIOD OF 15 YEARS IN FATUHA TOWN , STATE OF BIHAR , INDIA.
|