Design and Construction of drinking water supply scheme of Aurangabad Nagar Parishad under AMRUT and state plan Scheme (Phase II) with six months of Trial run and thereafter operation and maintenance of system for next five years.
(A) Construction of Elevated Service reservoir (ESR)/OHT-7 Nos., of different capacities ranging from 450 KL to 1350 KL having office room and toilet with water supply arrangement at ground below the tank DI/CI Distribution Network 96.68 km, providing house service connection-1400 Nos.
(B) Construction of High Yielding Tubewell-12 Nos., Raw Water Pump-1 set, Approach road-779.90 M (for CWR, ESR), Clear Water Pipe Line (CWR at Barun-20.10 km, (600 mm dia DI k9 Pipe), Construction of Gangway-1 set (3000m long 1 m wide), Lifting Arrangement 2 set, Chlorinator (200L)-1 No., Construction of Chlorinator room 1 No., Stand Post-20 Nos., Master Elevated Reservoir-1 No. (1270 KL), having office room and toilet at ground floor below tank area Intermediate Pumping Station-3 Nos., (Zone-III, Zone-V, Zone VI), Clear Water reservoir-1 No. at Barun (1340 KL), Clear Water Pump-1 Set, Clean Water Pumping Main-630 M (250mm dia, 600mm dia), Clear Water Gravity Main-12.012 km (250mm dia, 750mm dia), DI/CI Distribution Network 77.81 km (Zone I, III & IV), House Service Connection-8340 Nos., SCADA System-8 Nos.
|