Details
|
:
|
(i) Design and Build Sewage Treatment Plant of installed capacity 25 MLD -1 no. at Danapur town, 2 STPs (6 MLD &7 MLD) at Phulwarisharif town, 7 MLD-1 no. at Fatuha town and all Appurtenant structures and Allied works
(ii) Survey, review the designs, redesign where necessary, and construction of Interception & Diversion structures of drains, Gravity Sewer, Rising Main, Sewage Pumping Stations and All appurtenant Structures and Allied works controlled with SCADA and Operation & Maintenance of the complete works of Sewage Treatment Plant, Interception & Diversion works, Underground Gravity Sewer, Rising Main, Sewage Pumping Station and All Appurtenant structures for a period of 15 years
(A) Two (2 nos.) Interception & Diversion structures, Underground Gravity Sewer of 4.1 km length, Rising Main 2.8 km, One (1 no.) Sewage Pumping Station at Danapur Town, Construction of earthen channel 51.30 mtr, state of Bihar, India.
(B) The four (4 nos.) Interception & Diversion structures for the drains, Underground Gravity Sewer of 3.2 km length, Rising Main 3.2km, Three (3 nos.) Sewage Pumping Station at Phulwarishariff Town, State of Bihar ,india.
(C) Nineteen (19 nos.) Interception & Diversion structures for the Drains, Underground Sewerage Network – 5.7 Km, Construction of open drain 2.2 km, Rising Main, Sewage Pumping Station at Fatuha Town, state of Bihar,
Rs. 1.86Crore
Rs. 50,000.00
Rs. 17,700.00
Design, Build, Test and Commissioning period of 12 Months, and Operation and Maintenance period of 15years.
Page 5 of 490
India.
|