Infrastructure component of GWSP1 includes rehabilitation of the existing
water source works and construction of water distribution system including
transmission mains and distribution network, storage reservoirs, standpipes and
metered household connections. Infrastructure component of GWSP2 will provide
new water source works and transmission mains for the supply of bulk water to
the Gaya water distribution system. The construction periods of Packages 1 and 2
are expected to be coterminous, such that bulk water extracted from the new
water source works under Package 2 will be supplied to the water supply system
developed under Package 1. As a part of the Package 1 works, certain supply
points are identified to connect to the Package 2 transmission.
GWSP 2 outputs will include: (i) construction of 24 tube wells, with 58
MLD combined capacity; (ii) installation of around 24 flow meters; (iii) laying
of around 17.06 km of rising main; (iv) construction of pump house and 5 control
rooms; (v) construction of water storage reservoirs of around 3.7 ML capacity in
total; and (vi) construction of one operator office cum customer service center.
Status
·
The Contract has been awarded to M/s Aqua Design India
Private Limited in JV with Ramkey Infrastructures Limited. for INR 64.91 CR.