Career   |   Feedback |   Sitemap   Login
A Govt. of Bihar Undertaking

Gaya Wastewater Project GWWP   (Loan Tranche 3)

 

This proposed Gaya waste water project, (GWWP) of Improvement of Sewerage System of Gaya city is being prepared for Tranche – 3 (Project-3) financing. Loan agreement will be signed at later stage. The project is partly item rate and partly DBO contract. The DBO contract will be considered for STP, pumping mains and pumping stations. There are 2 phases of GWWP, in this project the construction phase of 36 months and other parallel phase of 60 months which cover operation & maintenance. O & M cost will be funded by the project fund during project period.  After project period O & M cost will be borne by the GMC (Gaya Municipal Corporation).

 

The prime objective of this assignment is to scale up existing urban infrastructure development schemes within a comprehensive, coherent strategic development framework in order to ensure optimal linkage of urban utilities and benefit of resources to the citizens of Gaya. This assignment aims to catalyze the thinking for wastewater management and lead stakeholders for systematic development of urban infrastructure.

 

Gaya Sewerage Western Part – GWWP1 (Loan Tranche 3)

 

Project Status:

ü  Land for the proposed Pumping Stations identified.

ü  DPR prepared. Technical Approval accorded.

ü  Administrative approval is under process.

ü  Bid Document finalized and approved. NIT to be floated after obtaining Administrative Approval (AA) from GOB.

 

BUIDCo | Terms of Use | Privacy Policy | RTI | Contact Us | Annual Report And Bye-Laws | Feedback
Copyright © 2016 BUIDco, All Rights Reserved   |   Accredited with ISO 9001:2008, 14001:2004
Visitor Counter